To the central content area

Industrial Parks Sewerage Systems Management Strategy and Continuous Waste Water Monitoring Systems (CWMS) Connection Quality Optimization Plan

Absrtact
This project’s 4 goals is of the following: 1. To improve wastewater pollution prevention and management of industrial parks sewerage systems (hereafter refer as industrial parks). 2. To collect greenhouse emission information and emission reduction control measures of industrial parks. 3. To upgrade the managing information system of the continuous wastewater monitoring system. 4. To strengthen the control of continuous wastewater monitoring system (hereafter refer as CWMS) and conduct systematic and functional inspection. In order to achieve the above 4 goals, this project’s contents including:(1) improving wastewater pollution prevention and management of industrial parks (2)collecting greenhouse emission information and emission reduction control measures of industrial parks(3)upgrading the managing information system of the CWMS (4) strengthening the control of CWMS and conducting systematic and functional inspection (5)assisting administrative relevant works. During the project execution period, we had accomplished outcomes including:(1)finishing industrial parks control data analyses for the past 3 years(year2020~2022) and proposing suggestions, tracking the compliance of ammonia-nitrogen in effluent of the last year and the compliance of the effluent with the stricter effluent standards of the past 3 years, drafting industrial parks water pollution prevention and control plan and integrating implementation results.(2)collecting carbon emission information of industrial parks (excluding businesses in the area), assisting in the review of carbon reduction strategies and promoting proactive improvements in carbon reduction for industrial parks.(3)offering CWMS data arrangement and re-unfolding functions for specific objects and time periods of local competent authorities, supplying the information disclosure system’s data account and password functions, adding the inspected result login and output functions of the CWMS systematic and functional inspection system, adding the Monitoring position number synchronization function of the CWMS managing information system and the CWMS facility instruction and confirmation report system.(4)analyzing CWMS RATA data in the past year, planning the local competent authorities 2023-CWMS management project, screening CWMS inspection list and accomplishing 5 inspections & inspection results with tracking list, assisting the integration and connection of the enterprises and sewage systems wastewater management system and the CWMS relative systems.(5)tracking installed progress and providing technical consultation on CWMS objects that should be installed, analyzing heavy metals effluent change trends of in industrial parks over the past five year and providing the list of the total quantity reduction plan if needed, adding up the commissioned agency to review the implementation results of the water pollution prevention and control measures plan, assisting gathering relevant data and offering administrative assistance about urban planning industrial area without united wastewater treatment works in 5 municipality, assisting in handling 2 educational training sessions in compliance with relevant regulatory requirements.
Keyword
industrial park sewerage system, Continuous Waste Water Monitoring Systems), greenhouse gas emission and reduction strategy
Open
top